Milestone Schedule – 12 Month Outlook

Milestone Schedule – Through 2031

TMSP Project Milestones
| Outer Roadway Elevated Deck Demolition Complete | Q4-2025 |
| B Pedestrian Access Closure | Q4-2025 |
| B Pedestrian Tunnel Reopens | Q1-2026 |
| Outer Roadway Elevated Deck Completion | Q4-2026 |
| Outer Roadway Substantial Completion | Q2-2027 |
| Concourse A Demolition Substantial Completion | Q1-2026 |
| Administration Building Pad Complete | Q1-2026 |
| Administration Building Final Completion | Q2-2027 |
Phasing Overview
Our objective is to develop the best phasing strategy that aligns design and construction with:
• Safety
• Passenger flows and wayfinding
• Baggage handling/processing
• Airline operations
• Tenant impacts
The Design and Construction Team developed and evaluated numerous phasing plans over the last several months.
The current plan, while a work-in-progress, provides the basic elements of each major phase.
5 Major Phases

7 Areas

Overall Phasing Plan
Plaza/Basement Level

Baggage Claim / Arrivals Level

Ticketing Lobby / Departures Level

Mezzanine Level

Roof Level

Starting Point, aka Phase 0
Baggage Claim / Arrivals Level
Gold-colored areas indicate construction zones.

Ticketing Lobby / Departures Level

Phase 1
Baggage Claim / Arrivals Level

Ticketing Lobby / Departures Level

Ticketing Lobby / Departures Level: Operational Focus

Phase 2
Baggage Claim / Arrivals Level

Ticketing Lobby / Departures Level

Phase 3
Baggage Claim / Arrivals Level

Ticketing Lobby / Departures Level

End State, aka Phase 4
Baggage Claim / Arrivals Level – Phase 4A

Baggage Claim / Arrivals Level – Phase 4B

Ticketing Lobby / Departures Level – Phase 4A

Ticketing Lobby / Departures Level – Phase 4B

Baggage Claim / Arrivals Level – Phase 4, End State

Ticketing Lobby / Departures Level – Phase 4, End State